Kanban guide · Lean foundations
What Is DevOps? Principles, Practices and DORA Metrics
DevOps is a way of working in which the people who build software and the people who run it share responsibility for getting changes to users quickly and keeping the service reliable. It combines a culture of shared ownership with Lean flow, automation and fast feedback, and its delivery performance is most often measured with DORA's five software delivery metrics. This guide explains the principles behind DevOps, the practices that put them into effect, how to calculate the metrics from a deployment log, and what DevOps changes for project managers.
Key takeaways
- DevOps is a set of cultural values and technical practices, not a tool, a job title or a framework with a rulebook. Its aim is fast, safe flow of changes from idea to production and fast feedback back again.
- CALMS (Culture, Automation, Lean, Measurement, Sharing) and Gene Kim's Three Ways (flow, feedback, continual learning) are the two most common summaries of its principles.
- DORA now measures software delivery with five metrics: change lead time, deployment frequency and failed deployment recovery time (throughput), plus change fail rate and deployment rework rate (instability). Lists of four metrics with "time to restore service" are out of date.
- DORA's research finds that speed and stability tend to improve together. Use the metrics to track one service's improvement over time, not as targets or to rank teams.
- For project managers, DevOps shifts control from large release gates and change boards towards small batches, automated checks and peer review, the approach DORA's research associates with better delivery performance.
What is DevOps?
DevOps is a set of cultural values, practices and tools that brings software development and IT operations together, so that one team, or closely aligned teams, build, release and run a service. It applies Lean and Agile thinking to the path from code change to production, using small batches, automation and fast feedback to deliver quickly and reliably.
The word joins development (writing and changing software) and operations (deploying, running, monitoring and supporting it). The idea is older than any tool: the people who change a system and the people who keep it running should work towards the same goal and see the same results.
DevOps is easy to misread, so three clarifications help:
- It is not only a job title. Many organisations employ "DevOps engineers" who build pipelines and automation, but a team does not become DevOps by hiring one, or by renaming its operations group.
- It is not a toolset. Pipelines, containers and monitoring tools support DevOps practices; buying them without changing how teams share responsibility tends to automate the old hand-offs.
- It has no single official guide. Unlike Scrum (the Scrum Guide) or Kanban (the Kanban Guide), DevOps has no governing body or definitive text. The most widely used evidence base is the survey research of DORA (DevOps Research and Assessment), published annually since 2014 and now hosted at dora.dev.
The problem DevOps set out to solve
In a traditional IT organisation, developers are rewarded for delivering change and operations staff for keeping systems stable. Each group optimises for its own goal. Developers hand over large releases; operations, wary of the risk, add approval steps and release windows; releases become larger and rarer; and each one is riskier than the last. When something fails, the investigation turns into a dispute about whose fault it was.
DevOps breaks that loop by making both groups accountable for the same outcome: changes that reach users quickly and work once they get there. That shared goal is why DevOps sits naturally beside Lean and Kanban: all three treat waiting, hand-offs and large batches as the main enemies of flow.
Where DevOps came from
DevOps emerged from practitioners rather than a standards body. The key steps are well documented:
| When | What happened | Why it matters |
|---|---|---|
| 2001 | The Agile Manifesto is published | Development teams start delivering working software in short iterations, but releases still queue behind operations |
| 2008–2009 | Belgian consultant Patrick Debois presents on "agile infrastructure" at the Agile 2008 conference in Toronto, and practitioners debate the gap between developers and operations | The problem is named as an organisational one, not a technical one |
| 30–31 October 2009 | Debois organises the first devopsdays conference in Ghent, Belgium | The shortened name "DevOps" spreads from the event's title |
| 2010s | Practitioners summarise the movement as CAMS, later CALMS; Gene Kim publishes the Three Ways (2012) | Principles that teams can apply without a prescribed method |
| 2014 onwards | The DORA research programme begins measuring software delivery performance through annual surveys | DevOps gains an evidence base and a shared set of metrics |
| 2023–2024 | DORA renames and narrows its recovery metric and adds a fifth metric, deployment rework rate | Current measurement guidance uses five metrics |
DevOps principles: CALMS and the Three Ways
Two summaries of DevOps principles are used widely. They overlap, but they answer different questions: CALMS describes what an organisation needs to have in place, while the Three Ways describe the direction of improvement.
The CALMS model
CALMS extends an earlier acronym, CAMS (Culture, Automation, Measurement, Sharing). Jez Humble, co-author of *The DevOps Handbook*, is generally credited with adding the L for Lean.
| Element | What it means in practice | Typical evidence that it is in place |
|---|---|---|
| Culture | Shared responsibility for outcomes between the people who build and the people who run a service | Developers take part in incident response; operations staff join planning |
| Automation | Builds, tests, environment set-up and deployments run without manual steps | Any engineer can deploy a tested change through the same pipeline |
| Lean | Small batches, limited work in progress and the removal of waiting | Changes are merged at least daily; queues before review and release are short |
| Measurement | Decisions are based on flow, quality and service data rather than opinion | The team reviews delivery metrics and service health regularly |
| Sharing | Knowledge, tools and lessons move freely between teams | Post-incident reviews are published; runbooks and dashboards are shared |
The Three Ways
Gene Kim set out the Three Ways in a 2012 article and later used them as the backbone of *The Phoenix Project* and *The DevOps Handbook*. Each Way implies specific practices:
| Way | Principle | Practices that put it into effect |
|---|---|---|
| First Way: flow and systems thinking | Optimise the whole value stream from requirement to customer, not one department | Value stream mapping, small batches, WIP limits, continuous delivery |
| Second Way: amplify feedback loops | Create fast feedback from right to left, from production and users back to development | Automated testing, monitoring and alerting, peer review, telemetry on user behaviour |
| Third Way: continual experimentation and learning | Build a culture that takes informed risks, learns from failure and practises until improvements stick | Blameless post-incident reviews, time reserved for improvement, controlled experiments |
The First Way is where DevOps meets the theory of constraints: improving a stage that is not the bottleneck does little for overall flow. A team that automates its build while changes still wait three days for a manual approval has optimised the wrong step.
Core DevOps practices
No single practice makes a team "do DevOps". The practices below appear in DORA's capability catalogue and in most practitioner accounts. The right-hand column shows which principle each one serves, which is useful when deciding where to start.
| Practice | What it does | Main principle served |
|---|---|---|
| Version control for everything | Application code, configuration, scripts and infrastructure definitions are stored and reviewed in one history | Flow; enables every other practice |
| Continuous integration and trunk-based development | Developers merge small changes into the main branch at least daily, with automated build and test on every merge | Flow and feedback |
| Continuous delivery | Every change that passes the pipeline is releasable, so release becomes a business decision, not a technical project | Flow |
| Test automation | Fast, reliable automated tests run on every change | Feedback |
| Infrastructure as code | Servers, networks and environments are defined in versioned files and created automatically | Flow; reduces configuration drift |
| Monitoring and observability | Teams see how the service behaves in production and are alerted before users report problems | Feedback |
| Loosely coupled architecture and teams | Teams can test and deploy their service without coordinating with many others | Flow |
| Working in small batches | Features are split so that each change can be finished, checked and released in hours or days | Flow and feedback |
| Blameless post-incident reviews | After an incident, the team asks what in the system allowed it, not who to blame | Learning |
DORA's guidance on small batches is concrete: if a batch of work takes more than a week to complete and check, it is too big. Smaller changes are easier to review, test, release and, when something goes wrong, to diagnose and reverse.
How DevOps fits with Agile, Lean, Kanban, SRE and ITIL
DevOps borrows from several older bodies of practice and overlaps with newer ones. The table separates what each one is, so you can combine them without confusing their purposes.
| Approach | What it is | Relationship to DevOps |
|---|---|---|
| Agile | A set of values and principles for delivering software iteratively | DevOps extends Agile's short feedback loops past "done in development" to release and operation |
| Lean | A management philosophy focused on value, flow and the removal of waste | Supplies the L in CALMS and the First Way's focus on flow |
| Kanban | A strategy for managing and improving the flow of work using visualisation, WIP control and flow metrics | A common way to run DevOps and operations teams day to day |
| Continuous delivery | A specific engineering practice that keeps software always releasable | One of the core technical practices inside DevOps |
| Site reliability engineering (SRE) | Google's approach to running services, using software engineering, service level objectives and error budgets | Google's SRE Workbook describes SRE as one concrete implementation of DevOps principles |
| ITIL / IT service management | A framework of service management practices, including change enablement and incident management | Compatible when change and incident practices are designed for small, frequent, automated changes |
DevOps and Kanban
DevOps and Kanban reinforce each other. Kanban makes the whole value stream visible, including operational work such as incidents and maintenance that is often invisible on development boards; DORA lists visual management, visibility of work in the value stream and WIP limits among its capabilities. Kanban's flow metrics then describe the work end to end, while DORA's metrics focus on the stretch from commit to production.
The two sets of measures differ in scope. Lead time in Kanban usually starts when a request is accepted; DORA's change lead time starts only when code is committed. A team can have a change lead time of a few hours and still keep customers waiting weeks, because most of the delay happens before anyone writes code. Track both. Teams running a mix of planned work and interruptions will find practical policies, including reserved capacity and classes of service, in our guide to Agile IT operations.
DevSecOps and platform engineering
DevSecOps moves security into the same flow: dependency scanning, static analysis and policy checks run in the pipeline on every change, and security specialists help teams build safe defaults instead of inspecting finished releases. DORA calls this capability pervasive security.
Platform engineering provides internal, self-service platforms (pipelines, environments, observability, templates) so that each product team does not have to build its own. DORA's 2025 report found that 90% of surveyed organisations had adopted at least one internal platform, and linked platform quality to an organisation's ability to benefit from AI. A platform team is a product team whose customers are other developers; it fails when it becomes a new ticket queue between development and operations.
How DevOps performance is measured: the five DORA metrics
DORA defines five software delivery performance metrics, grouped into throughput (how many changes move through the system) and instability (how well deployments go). The list below follows DORA's metrics guide on dora.dev, last updated in January 2026, and matches our guide to Agile metrics and KPIs.
| Metric | Group | Definition | Usual unit |
|---|---|---|---|
| Change lead time | Throughput | Time from a change being committed to version control to that change being deployed to production | Hours or days (median and percentiles) |
| Deployment frequency | Throughput | How often deployments to production happen, or the time between deployments | Deployments per day or week |
| Failed deployment recovery time | Throughput | Time to recover from a deployment that fails and needs immediate intervention | Minutes or hours (median) |
| Change fail rate | Instability | Share of deployments that need immediate intervention, such as a rollback or hotfix | Percentage of deployments |
| Deployment rework rate | Instability | Share of deployments that are unplanned and result from an incident in production | Percentage of deployments |
Why older articles list four metrics
DORA's history of its metrics, published on dora.dev in January 2026, explains the changes. The research began in 2014 with four candidate measures: deployment frequency, lead time, mean time to recover (MTTR) and change fail rate. By 2015 all four were in use, split into throughput and stability groups, and they later became known as the "four keys". In 2023 MTTR, also called time to restore service, was renamed failed deployment recovery time and narrowed to failures caused by a change to production; the old measure mixed in outages with external causes, such as a data centre failure, that say nothing about delivery. In 2024 DORA added deployment rework rate and regrouped the five metrics into throughput and instability.
DORA also measures reliability (formerly availability), but treats it as a measure of operational performance rather than a sixth delivery metric. Its own history page notes that the 2021 report wrongly called reliability the fifth metric.
How to read the metrics
- Speed and stability are not a trade-off. DORA reports that the metrics are generally correlated: teams that are strong on one tend to be strong on all five.
- Measure one application or service at a time. Blending a mobile app, a batch data platform and a website into one number hides the differences that matter.
- Compare a service with its own past, not with other teams. DORA advises using the metrics to track improvement over time rather than to rank teams, and notes that comparing very different applications can mislead.
- Never set a single metric as a target. A team told to raise deployment frequency can split deployments artificially. Read the throughput and instability groups together, so that one cannot improve at the other's expense unnoticed.
DORA metrics are one category in a wider measurement set that also includes flow, quality, value and team health measures.
Worked example: calculating DORA metrics from a deployment log
Illustrative example. A product team runs one customer-facing web service. Over four weeks (20 working days) it made 20 production deployments. To keep the arithmetic simple, each deployment carried one change. Before calculating anything, the team wrote down its counting rules, because the same log can produce different numbers under different rules.
| Counting rule | Team's choice |
|---|---|
| Change lead time starts | When the change is committed to the main branch |
| Change lead time stops | When the deployment completes in production |
| Time unit | Elapsed clock hours, including nights and weekends |
| Failed deployment | A deployment needing immediate intervention: rollback, hotfix or feature switched off |
| Rework deployment | An unplanned deployment made because of a production incident (a hotfix counts here, not as a failure) |
| Recovery time | From detection of the failure to service restored for users, in minutes |
Step 1: deployment frequency
Deployment frequency = number of production deployments ÷ length of period. With 20 deployments in 4 weeks: 20 ÷ 4 = 5 deployments per week, or 20 ÷ 20 = 1 per working day.
Step 2: change lead time
The 20 lead times, sorted, in hours: 3, 4, 5, 6, 6, 8, 9, 20, 22, 24, 26, 27, 30, 46, 50, 52, 70, 72, 75, 120. Lead time data is skewed by a few slow changes, so report the median and a high percentile rather than the mean.
- Median (half of changes deployed within this time): the average of the 10th and 11th values, (24 + 26) ÷ 2 = 25 hours.
- 85th percentile (nearest-rank method): rank = 0.85 × 20 = 17, so the 17th value, 70 hours. About 85% of changes reached production within 70 hours.
- Mean for comparison: 675 ÷ 20 = 33.75 hours, pulled upwards by the 120-hour change.
Step 3: change fail rate and deployment rework rate
Three deployments needed immediate intervention: two were rolled back and one was fixed by a hotfix. Two deployments were unplanned: the hotfix itself, and an urgent fix for a production incident that users reported, caused by a long-standing defect rather than by any of this period's deployments.
- Change fail rate = failed deployments ÷ total deployments × 100 = 3 ÷ 20 × 100 = 15%.
- Deployment rework rate = unplanned deployments caused by production incidents ÷ total deployments × 100 = 2 ÷ 20 × 100 = 10%.
Step 4: failed deployment recovery time
The three failures took 35, 50 and 240 minutes to recover. The median is 50 minutes; the mean is (35 + 50 + 240) ÷ 3 = 108.3 minutes, more than twice the median because of one long recovery. With only three failures, report the individual values alongside any summary figure.
Interpreting the results
| Metric | Result | Unit |
|---|---|---|
| Deployment frequency | 5 | Deployments per week |
| Change lead time | Median 25; 85th percentile 70 | Hours |
| Failed deployment recovery time | Median 50 (values 35, 50, 240) | Minutes |
| Change fail rate | 15 | % of deployments |
| Deployment rework rate | 10 | % of deployments |
The numbers raise questions rather than answer them. Half of the changes reached production within about a day, yet six of the twenty (30%) took more than 48 hours. When the team traced those six, most had waited over a day for code review. Waiting time, not deployment speed, was the constraint.
Following DORA's improvement approach, the team committed to one constraint: review waiting time. It agreed a working policy that open reviews are picked up before new work is started, tracked time to first review as a leading indicator, and planned to recalculate the five metrics after another four weeks. It also opened a blameless review of the 240-minute recovery, because one long recovery matters more to users than the median suggests.
Two limitations apply. Twenty deployments is a small sample, so a single extra failure moves the change fail rate by 5 percentage points; look at the trend over several periods before drawing conclusions. And the figures describe one service only: they say nothing about whether customers value what was deployed, which needs outcome measures such as adoption or satisfaction.
How to start a DevOps improvement
DORA recommends treating improvement as a repeating cycle owned by the whole cross-functional team, rather than a tool roll-out. Adapted for a team starting out:
- Choose one service and set a baseline. DORA's online Quick Check gives a survey-based starting point; a month of deployment records gives a measured one.
- Map the path from commit to production. Record each step and how long changes wait before it. Include approvals, environment requests and manual testing.
- Agree the biggest constraint. Pick one: often manual testing, long-lived branches, environment provisioning or change approval.
- Turn it into a plan with leading indicators. For example, time to first code review, build duration or the share of tests automated. These move weeks before the DORA metrics do.
- Make the improvement work visible. Put it on the team's Kanban board alongside feature work, with capacity reserved for it.
- Check progress and repeat. Recalculate the metrics, discuss them in a retrospective, and move to the next constraint.
What DevOps changes for project managers
DevOps does not remove the need for planning, risk management or stakeholder communication, but it changes where control sits.
Change approval
Many organisations route every production change through a change advisory board (CAB). DORA's research found that heavyweight external approval, such as a CAB or senior-manager sign-off, was associated with worse software delivery performance, and found no evidence that it lowered change fail rates. Its 2019 report concluded that approval works best through peer review during development, recorded in the team's tools, supported by automated testing and monitoring. The CAB's role shifts towards coordinating across teams and deciding business trade-offs. Our guide to change control explains how to separate scope and contract changes, which still need formal decisions, from routine technical changes.
Release and delivery planning
When deployment is routine, release becomes a business decision about when users should see a feature, often controlled with feature flags. Plans shift from fixed release dates for large bundles to forecasts based on throughput and a release plan that is revised as data arrives. Deploying and releasing are no longer the same event.
Risk and reporting
Small, frequent changes carry less risk each, but they need different controls: automated tests, rollback procedures and monitoring replace large pre-release test phases. Record these controls as risk responses in the risk register. For reporting, the five DORA metrics and Kanban flow metrics give stakeholders a factual view of delivery capability; combine them with outcome measures so that reports show value as well as speed. Use a root cause analysis template to structure post-incident reviews without assigning blame.
DevOps changes how software reaches users, but the surrounding project still needs a life cycle, estimates and governance. See our guide to software project management for how those fit together.
AI and DevOps: what the 2025 DORA research found
DORA's 2025 report, *State of AI-assisted Software Development* (published 23 September 2025, based on survey responses from nearly 5,000 technology professionals), found that 90% of respondents used AI at work. Its central finding is that AI acts as an amplifier: it strengthens teams with good practices and intensifies the problems of teams without them.
- AI adoption showed a positive relationship with software delivery throughput and product performance.
- It continued to show a negative relationship with delivery stability: producing more change faster exposes weak testing, version control and feedback loops downstream.
- Teams with loosely coupled architectures and fast feedback saw gains; tightly coupled systems with slow processes saw little benefit.
The practical lesson is that AI coding assistants do not replace DevOps foundations. DORA's guidance on small batches specifically warns against oversized AI-generated pull requests, which are harder to review. Generated code still needs human review, automated tests and clear accountability for what reaches production; confidential code and data also need clear rules about which AI tools may see them.
Limitations and when DevOps is harder to apply
DevOps principles apply widely, but some contexts limit how far the practices can go. The continuous delivery guide shows how teams adapt pipelines to regulated, embedded and legacy settings; the points below concern DevOps as a whole.
- Regulated or safety-critical software may require formal verification and release certification, so production releases stay infrequent. Shared ownership, automation and fast feedback still apply before release, and DORA lists "using industry as a shield against improving" as a pitfall.
- Small teams with little operational load may gain more from version control, automated testing and a simple pipeline than from a platform team or an SRE practice.
- Non-software projects can borrow the ideas (small batches, fast feedback, blameless learning) but not the DORA metrics, which are defined for software deployments.
Common DevOps mistakes
- Creating a separate "DevOps team" between development and operations. This adds a third silo and another hand-off. A platform team that offers self-service tools is different from a team that performs deployments on others' behalf.
- Buying tools before changing ownership. A pipeline that ends at a manual sign-off three days later has automated the fast part of the process.
- Automating a broken process. Remove unnecessary steps and approvals first, then automate what remains.
- Using DORA metrics as targets or league tables, or tracking speed alone. Both invite gaming and hide instability, as explained under how to read the metrics.
- Mixing old and new definitions. "Time to restore service" also counted outages with external causes; failed deployment recovery time counts only failures caused by a change. A trend that switches definition part-way is not comparable.
- Blaming individuals after incidents. People stop reporting near misses, and the organisation loses the information it needs to learn. Capture what you learn with a lessons learned process.
DORA metrics cover only the stretch from commit to production. See our guide to Kanban metrics for the flow measures that cover the rest of the journey.
Free templates for this topic
Frequently asked questions
What is DevOps in simple terms?
DevOps is a way of working in which the people who build software and the people who run it share responsibility for releasing changes quickly and keeping the service reliable, using small batches, automation and fast feedback.
Is DevOps a role or a culture?
Primarily a culture and set of practices. Many organisations also employ DevOps engineers, who usually build and maintain deployment pipelines, infrastructure automation and monitoring, but hiring one does not make a team DevOps on its own.
When did DevOps start?
The term spread after Patrick Debois organised the first devopsdays conference in Ghent, Belgium, on 30–31 October 2009. The underlying ideas grew from Agile and Lean practice in the preceding years.
What does CALMS stand for in DevOps?
Culture, Automation, Lean, Measurement and Sharing. It extends the earlier CAMS acronym; Jez Humble is generally credited with adding Lean.
What are the Three Ways of DevOps?
Gene Kim's three principles: flow and systems thinking from development to the customer, amplified feedback loops from production back to development, and a culture of continual experimentation and learning.
What are the DORA metrics?
Five software delivery metrics: change lead time, deployment frequency and failed deployment recovery time (throughput), and change fail rate and deployment rework rate (instability). Deployment rework rate was added in 2024.
Why did DORA replace time to restore service?
In 2023 DORA renamed mean time to restore as failed deployment recovery time and limited it to failures caused by a change to production. The old measure also counted outages with external causes, which do not reflect delivery performance.
Is DevOps part of Agile?
DevOps extends Agile ideas beyond development into release and operations. Agile shortens the loop for building software; DevOps shortens the loop for getting it safely to users and learning from how it behaves.
What is the difference between DevOps and continuous delivery?
Continuous delivery is a specific engineering practice that keeps software always releasable. DevOps is the broader culture and set of practices, of which continuous delivery is a central part.
How is DevOps different from SRE?
Site reliability engineering is Google's approach to running services with software engineering, service level objectives and error budgets. Google's SRE Workbook presents it as one concrete way of implementing DevOps principles.
What is a blameless post-incident review?
A review after an incident that asks what in the system allowed the problem to happen, rather than who caused it, so that people share information openly and the team can fix the underlying causes.