Scrum guide · Artifacts and practices
Scrum Software Tools: What to Look For and How to Choose
Scrum software tools are applications that help a Scrum Team manage its Product Backlog, plan and track Sprints, and make progress visible to everyone. Scrum does not require any software, but most teams, especially remote and multi-team ones, use a tool, and the right one makes Scrum easier while the wrong one adds bureaucracy. This guide explains which features matter, compares the main options using our review data, and gives you a step-by-step way to choose and set up a tool.
Key takeaways
- A Scrum tool needs an ordered Product Backlog, Sprint planning, a Sprint board, estimation fields, burndown or velocity reports and a visible Sprint Goal. Everything else is optional.
- Dedicated Agile trackers such as Jira give the deepest Scrum features; all-in-one platforms such as Wrike, monday.com, Asana and ClickUp suit organisations where Scrum teams work alongside other teams.
- Wrike, our top-rated tool overall (9.4/10), is a strong choice when Scrum teams need cross-team visibility, portfolio views and resource planning; Jira scores highest for pure software Scrum in our reviews.
- Choose by trialling two or three tools on a real Sprint, scoring them against weighted criteria and asking the team which helped most.
- Start with default settings, one Product Backlog per product and as few workflow statuses as possible. Add configuration only when a real problem needs it.
- Tools support transparency but never replace the conversations in Sprint Planning, the Daily Scrum, the Sprint Review and the Retrospective.
What are Scrum software tools?
Scrum software tools are applications that hold a Scrum Team's Product Backlog, Sprint Backlog and progress in one shared place. They let teams order work, plan Sprints, track items on a board, estimate effort and see reports such as burndown charts. Good tools make Scrum's artifacts transparent without changing how the team works.
The 2020 Scrum Guide does not mention software at all. A wall, sticky notes and a marker still make a perfectly good Scrum board for a co-located team. Teams adopt software because it solves practical problems: remote and hybrid team members need to see the same board, stakeholders want access without attending every event, reports are tedious to draw by hand, and work items need to link to code, documents and chat.
The risk runs the other way too. A tool configured with dozens of statuses, mandatory fields and approval steps can quietly replace self-management with process. The best Scrum tool is the simplest one that makes your artifacts transparent.
Types of Scrum tools
Scrum tools fall into a few broad groups. Many teams combine one main tool with a couple of supporting ones.
| Type | Examples | Strengths | Trade-offs |
|---|---|---|---|
| Dedicated Agile and developer trackers | Jira, Azure DevOps, Linear | Deep backlog, Sprint and reporting features; tight links to code repositories | Built around software work; can feel technical to business teams |
| All-in-one work management platforms | Wrike, monday.com, Asana, ClickUp | One platform for Scrum teams and the rest of the organisation; dashboards, portfolios and automation | Scrum-specific reports vary by tool and plan |
| Microsoft 365 tools | Microsoft Planner premium plans | Lives in Teams and Outlook; backlogs and Sprints on premium plans | Lighter Scrum reporting |
| Docs-first workspaces | Notion | Specs, notes and Sprint boards in one place | You build and maintain much of the system yourself |
| Simple board tools | Trello | Fast to adopt, very visual | Limited backlog management and Sprint reporting |
| Supporting tools | Online whiteboards, planning poker apps, chat and video | Help with Retrospectives, estimation and remote events | Do not hold the backlog; add to your tool count |
| Spreadsheets and physical boards | Excel, Google Sheets, a wall | Free, flexible, no learning curve | No live board for remote teams; manual reports |
Must-have features mapped to Scrum
The easiest way to judge a Scrum tool is to check whether it supports each part of the framework. The table lists the features that matter and why.
| Scrum element | Feature to look for | Why it matters |
|---|---|---|
| Product Backlog | One ordered list with drag-and-drop ranking, item types and filters | The Product Owner must be able to order work quickly and show one clear priority |
| Backlog refinement | Item detail with description, acceptance criteria, attachments and comments; parent-child links (epics and stories) | Refinement needs somewhere to capture what the team learns |
| Sprint Planning | Create a Sprint with dates, drag items into it, see total estimate against capacity | Helps the team forecast realistically |
| Sprint Goal | A visible goal field on the Sprint or board | Keeps the Sprint focused on an outcome, not a list |
| Sprint Backlog and board | A board with a few clear columns, swimlanes and WIP indicators | Supports the Daily Scrum and shows progress at a glance |
| Estimation | Story point or effort field; optional planning poker | Needed for forecasting and velocity; see story points |
| Increment and Definition of Done | Checklists or a linked Definition of Done; release or version tracking | Makes the quality bar visible on every item |
| Reports | Burndown or burnup, velocity, cumulative flow | Feeds inspection at the Sprint Review and Retrospective |
| Transparency for stakeholders | Read-only or guest access, shareable dashboards | Stakeholders can see progress without status meetings |
| Integrations | Code repositories, chat, documents, calendars | Keeps the tool current without double entry |
Useful extras
- Automation, for example moving an item to Done when its pull request merges, or rolling unfinished items back to the backlog.
- Cross-team views, such as shared backlogs, dependency links and portfolio dashboards, once you have several teams.
- Retrospective boards built into the tool, or an integration with a whiteboard app.
- Workload and capacity views that show who is overloaded across teams.
- AI assistance for drafting stories, summarising threads or answering questions about progress. Useful, but check which plan includes it.
Scrum tools compared
The table summarises tools we review in depth. Overall scores, Agile scores, Sprint support and prices come from our reviews, where pricing was last checked on 7 October 2026. Prices are per user per month unless stated, and vendors change them often, so confirm before you buy.
| Tool | Our overall score (rank) | Agile and software teams score | Built-in Sprint tools | Free plan | Paid plans from | Best for |
|---|---|---|---|---|---|---|
| Wrike | 9.4 (#1) | 8/10 | Partial | Yes | $10 (Team, billed annually) | Scrum teams inside larger organisations needing visibility, portfolios and resource planning |
| monday.com | 9.1 (#2) | 7/10 | Partial (sprints in the separate monday dev product) | Up to 2 seats | $9 per seat (Basic, billed annually, minimum 3 seats) | Visual, easy-to-adopt workflows across many departments |
| Asana | 9.0 (#3) | 7/10 | Partial | Personal plan, 2 users | $10.99 (Starter, billed annually) | Cross-team coordination linked to goals |
| ClickUp | 8.9 (#4) | 9/10 | Yes | Free Forever | $7 (Unlimited, billed annually) | Budget-conscious teams wanting sprints, docs and dashboards together |
| Smartsheet | 8.6 (#5) | 6/10 | Partial | No | $9 (Pro, billed yearly) | Spreadsheet-minded organisations |
| Jira | 8.6 (#6) | 10/10 | Yes | Up to 10 users | About $7.91 (Standard, monthly billing, small teams) | Software, IT and product teams running Scrum by the book |
| Microsoft Planner | 8.1 (#7) | 6/10 | Partial (premium plans) | Basic Planner in Microsoft 365 | $10 (Plan 1, paid yearly) | Microsoft 365 organisations with light Agile needs |
| Notion | 8.0 (#8) | 6/10 | Partial | Yes | $10 (Plus, yearly rate) | Teams wanting docs and Sprint boards in one place |
| Trello | 7.8 (#9) | 7/10 | Partial | Up to 10 collaborators per Workspace | $5 (Standard, billed annually) | Small teams wanting simple boards |
| Basecamp | 7.6 (#10) | 3/10 | No | 1 project | $25 per month flat (Freelancer) | Communication-centred projects rather than Scrum |
Overall scores reflect a tool's strength as project management software across all our criteria, not only Scrum. That is why Jira ranks sixth overall but scores highest of all the tools for Agile and software teams. See our full top 10 project management tools for the methodology.
The main Scrum tools in brief
Each tool below can support Scrum. The notes focus on how well each one fits Scrum specifically; follow the links for full reviews.
Wrike
Wrike is our top-rated project management tool overall (9.4/10). For Scrum, it offers board views on every plan, including Free, plus ready-made Agile Teamwork, Sprint Planning and Sprint Retrospective templates, custom workflows, workload views and dashboards. Its main strength for Scrum is what sits around the team: cross-project dashboards, portfolio views and resource planning that help when several Scrum teams, marketing and operations share one platform, or when you are scaling Scrum. Our review rates its Sprint tooling as partial and its Agile score as 8/10: it is less specialised in Scrum reports than Jira. Wrike Sync, an add-on included in Apex, offers two-way sync with Jira and GitHub so developers and business teams can each stay in their preferred tool.
Jira
Jira is the most complete Agile tool for software teams that we review, with a 10/10 Agile score. Backlogs, epics, story points, Sprints, Scrum boards, burndown, velocity and cumulative flow reports, and deep links to code are all mature, and the Free plan covers up to 10 users. The trade-offs are a steep learning curve and real administration effort, and non-technical teams often find it heavy. Compare the two leaders in Wrike vs Jira.
ClickUp
ClickUp is one of the stronger general-purpose tools for Scrum (9/10 for Agile). Sprints are dated Lists, unfinished work can roll over automatically, and the Business plan adds sprint points plus burndown, burnup, velocity and cumulative flow reporting. Docs for specifications sit next to the work. Expect to invest time in setup; reviewers mention a dense interface and occasional lag.
monday.com
monday.com is one of the easiest capable platforms to roll out. Work management boards handle simple Sprints, and monday.com sells a separate product, monday dev, for Sprints, roadmaps and bug tracking. It suits organisations where many non-technical teams also need workflows and dashboards.
Asana
Asana is approachable and strong at coordinating work across teams and linking it to goals. It supports boards and Sprint-style projects; teams that rely on backlogs, story points and Agile reports will find dedicated tools deeper. Product teams often pair Asana with Jira or GitHub through integrations.
Microsoft Planner
Planner's premium plans (Plan 1 and above) add a prioritised backlog and time-boxed Sprints inside Microsoft 365, which suits light Agile work. Microsoft does not document story points, velocity or burndown, so Scrum teams that rely on these should test carefully.
Notion
Notion can add Sprints to a task database, with Current sprint, Sprint planning and Backlog views, a choice of what happens to unfinished tasks and optional automated Sprints that start and close on schedule. It is excellent for specs and decision logs next to the work, but lacks packaged velocity and burndown reports.
Trello
Trello is the quickest way to get a Sprint board in front of a small team. Custom fields (Standard plan and above) or Power-Ups can hold story points, but there is no native backlog management or Sprint reporting. Jira, from the same company, is the natural next step.
Smartsheet and Basecamp
Smartsheet offers a board view on a grid-first platform and suits teams that plan in spreadsheets; its Sprint tooling is limited compared with Jira. Basecamp is designed for calm, communication-centred projects and has no backlogs, Sprints or velocity reports, so Scrum teams usually pair it with, or choose, a dedicated tool.
Other options
Outside our reviews, Azure DevOps (Azure Boards) is common in Microsoft-centred engineering teams: its Basic plan is free for the first five users, then $6 per user per month, and includes backlogs, Sprint planning and Kanban boards (checked 4 November 2026). Linear is popular with product and engineering teams that like a fast, keyboard-driven tracker; it calls Sprints cycles. Check both vendors' current plans directly.
Which Scrum tool suits your team?
Use this table to build a shortlist of two or three tools. It is a starting point, not a verdict; your trial decides.
| Your situation | Shortlist to trial | Why |
|---|---|---|
| One or a few software teams running Scrum by the book | Jira, ClickUp | Deepest Scrum features and developer integrations |
| Scrum teams inside a larger organisation that needs portfolio, resource and cross-team visibility | Wrike, Jira (with Wrike Sync if teams want different tools) | Wrike's dashboards, portfolios and resource planning; Jira for engineering depth |
| Mixed software and business teams on one platform | Wrike, ClickUp, monday.com | One tool for everyone, with Sprint support of varying depth |
| Non-software teams adopting Scrum (marketing, HR, operations) | Wrike, monday.com, Asana | Easier for non-technical users; flexible workflows |
| Microsoft 365 organisation with light Agile needs | Microsoft Planner (premium), Azure DevOps for engineering | Stays inside Teams and Outlook |
| Small team, tight budget | Jira Free, ClickUp Free Forever, Trello | Usable free plans |
| Docs-heavy product team | Notion, ClickUp | Specs and Sprint boards side by side |
How to choose a Scrum tool, step by step
A structured selection takes two to four weeks and avoids choosing on demos alone.
- List your problems and must-haves. Start from the feature table above. Mark each feature as must-have, nice-to-have or not needed.
- Identify who will use it. Developers, Product Owners, Scrum Masters, stakeholders and other teams have different needs. Include at least one person from each group in the selection.
- Set weighted criteria. Typical criteria are Scrum features, cross-team visibility, ease of adoption, integrations, scalability and cost. Weights should add up to 100%.
- Shortlist two or three tools. Use the situation table and our tool reviews to narrow the field.
- Trial on a real Sprint. Set up your actual backlog, run one full Sprint, including all events, in each tool or in parallel teams. Sample data hides friction.
- Score each tool. Ask trial users to score each criterion from 1 to 5, then calculate weighted scores.
- Check the total cost. Include the plan you will really need (for example, story points or dashboards may need a higher tier), add-ons, AI usage and admin time.
- Decide and plan the rollout. Choose, agree conventions, migrate the backlog and review the decision after three or four Sprints.
Our guide on how to choose project management software covers vendor questions and contract checks in more detail.
Worked example: a weighted scoring matrix
The following example is illustrative. The organisation, weights and scores are invented to show the method; your weights and results will differ.
A 120-person company has three Scrum software teams plus marketing and operations teams. Leadership wants one view of all work and team capacity, and the software teams want solid Sprint support. The selection group shortlists Wrike, Jira and ClickUp, trials each for one Sprint, and scores them from 1 (poor) to 5 (excellent) for this company's needs.
| Criterion | Weight | Wrike | Jira | ClickUp |
|---|---|---|---|---|
| Scrum features (backlog, Sprints, estimation, reports) | 20% | 3 | 5 | 4 |
| Portfolio and resource visibility across teams | 30% | 5 | 3 | 3 |
| Ease of adoption for non-technical teams | 15% | 3 | 2 | 3 |
| Integrations (code, chat, documents) | 15% | 4 | 5 | 4 |
| Scalability and admin controls | 10% | 5 | 4 | 4 |
| Cost | 10% | 3 | 4 | 5 |
| Weighted score | 100% | 3.95 | 3.75 | 3.65 |
Wrike wins here because this company puts the most weight on cross-team visibility and resource planning. A company with only software teams that weighted Scrum features at 40% would probably land on Jira or ClickUp instead. That is the point of the method: the weights encode what matters to you, and the trial supplies the scores.
How to set up a Scrum tool
Whatever you choose, these steps keep the tool working for Scrum rather than against it.
- Create one Product Backlog per product. Several teams on one product should draw from the same backlog, filtered by team if needed.
- Keep the workflow short. Start with To do, In progress and Done, and add a column such as In review only if it shows a real wait state.
- Add only the fields you need. Item type, estimate, Sprint, priority order and acceptance criteria are usually enough.
- Set the Sprint length and naming. Use consistent dates and names so reports line up.
- Make the Sprint Goal visible on the board or Sprint, not buried in a document.
- Link the Definition of Done. Add it as a checklist template or a pinned page so every item shows the quality bar. See our guide to the Definition of Done.
- Switch on the core reports: burndown or burnup, velocity and cumulative flow if available.
- Give stakeholders read access or a shared dashboard so they can follow progress between Sprint Reviews.
- Connect integrations for code, chat and documents so the board stays current without double entry.
- Agree conventions for writing items, using labels and moving cards, and write them down in one short page.
If your team is migrating from a spreadsheet, our product backlog template shows a clean column structure that imports easily into most tools.
Running Scrum events in a tool
Tools can make events smoother, but each event's value comes from the conversation. The table shows where to draw the line.
| Event | What the tool helps with | What must stay a conversation |
|---|---|---|
| Sprint Planning | Showing the ordered backlog, estimates, capacity and the draft Sprint Backlog | Agreeing the Sprint Goal and what can realistically be done |
| Daily Scrum | Showing the board and blocked items | Adapting the plan towards the Sprint Goal |
| Sprint Review | Burnup or release charts, the Increment, updated backlog | Stakeholder feedback and what to do next |
| Sprint Retrospective | Past actions, metrics, a whiteboard for ideas | Honest discussion and choosing improvements |
| Backlog refinement | Item details, splitting, estimating | Shared understanding of what the work means |
Keep Sprint Retrospective actions where the team will see them, for example as items in the next Sprint Backlog. Our Sprint Retrospective template works well alongside any tool.
Free and low-cost Scrum tools
Several tools offer free plans that can run real Sprints. The limits below come from our reviews (checked 7 October 2026).
- Jira Free: up to 10 users, with Scrum and Kanban boards, backlogs, the timeline, reports and basic automation. One of the most capable free options for software teams.
- ClickUp Free Forever: unlimited members, Board view and Sprints, but 60MB of storage and trial-only Dashboards; sprint points need Business.
- Wrike Free: board and table views with basic task and project management; Gantt charts and shareable dashboards start on Team.
- Trello Free: up to 10 collaborators per Workspace with simple boards; no native Sprint reports.
- Notion Free: task databases with Sprint views, good for small teams that also want docs.
- Azure DevOps Basic: free for the first five users.
Free plans are a good way to test whether a tool suits your way of working. Pay when a real problem, such as reporting, more users or integrations, needs a paid feature.
Can you run Scrum with a spreadsheet or physical board?
Yes, within limits. A physical board is excellent for a co-located team: it is always visible, easy to change and encourages conversation at the Daily Scrum. A spreadsheet can hold an ordered backlog, a Sprint plan and a simple burndown.
The limits appear as soon as people work remotely, stakeholders want live visibility or you run more than one team. Spreadsheets have no live board, weak collaboration on individual items and manual reports. Treat them as a starting point or a stopgap.
If you want to start that way, our free product backlog template and Sprint planning template give you a ready-made structure, and the columns map directly onto most Scrum tools when you are ready to move.
Tips for adopting a Scrum tool
- Start with default settings and add fields, statuses and automations only when the team agrees a real need.
- Keep one Product Backlog per product, ordered by the Product Owner.
- Agree conventions for writing items, labels and estimates, and keep them on one page.
- Train by doing. Run Sprint Planning in the tool from day one rather than holding a separate training session.
- Use the board at the Daily Scrum so it stays current.
- Review the tool in a Retrospective after three or four Sprints. Ask what helps, what gets in the way and what to switch off.
- Name a tool owner to handle administration, but keep decisions about the workflow with the team.
Common mistakes when choosing and using Scrum tools
- Choosing on a demo. Demos use perfect sample data. Always trial on a real Sprint.
- Letting the tool define the process. If a default workflow does not match how the team works, change the workflow, not the team.
- Over-configuring. Ten statuses and fifteen mandatory fields slow everyone down and hide the real state of work.
- Several backlogs for one product. Teams pull against each other and the Product Owner loses control of order.
- Using reports to judge people. Velocity and burndown are planning aids, not performance targets. See our guide to Scrum metrics and KPIs.
- Forcing one tool on very different teams without checking their needs. Shared reporting matters, but so does adoption.
- Ignoring total cost. Key Scrum features such as story points, dashboards or AI may sit on higher plans or add-ons.
- Replacing conversations with comments. A comment thread is not a Sprint Review.
Frequently asked questions
What is the best Scrum tool?
There is no single best tool. In our reviews Jira scores highest for Agile and software teams, while Wrike is our top-rated tool overall and suits Scrum teams that need cross-team visibility and resource planning. ClickUp, monday.com and Asana also support Scrum, with different strengths.
Do we need a paid Scrum tool?
No. Many teams start with a physical board or a free plan such as Jira Free or ClickUp Free Forever. Pay for features that solve real problems, such as reporting, more users or integrations.
Is Jira a Scrum tool?
Jira is a general work management and issue-tracking tool with very strong Scrum support: backlogs, Sprints, story points, Scrum boards and burndown and velocity reports, all available on its Free plan for up to 10 users.
Can Wrike be used for Scrum?
Yes. Wrike offers board views, Agile Teamwork, Sprint Planning and Sprint Retrospective templates, custom workflows, workload views and dashboards. Its strength is visibility across teams and projects; for the deepest Scrum-specific reporting, software teams often use Jira, which Wrike can sync with through its Wrike Sync add-on.
Can Trello work as a Scrum tool?
Yes, for simple setups. Lists for each stage and custom fields or Power-Ups for story points can work, but backlog management and Sprint reporting are limited.
What features should a Scrum tool have?
An ordered Product Backlog, Sprint planning with capacity, a Sprint board, estimation fields, burndown or velocity reports, a visible Sprint Goal, stakeholder access and integrations with code and chat tools.
Can Excel be used as a Scrum tool?
A spreadsheet can hold a backlog, a Sprint plan and a simple burndown, but it lacks a live board and item-level collaboration. It is a sensible stopgap rather than a long-term solution for remote or multi-team work.
Are there free Scrum tools?
Yes. Jira Free (up to 10 users), ClickUp Free Forever, Wrike Free, Trello Free, Notion Free and Azure DevOps Basic (first five users) can all support small teams. Check each vendor's current limits.
What is the difference between Scrum and Kanban tools?
Scrum tools add time-boxed Sprints, Sprint Goals, estimation and Sprint reports such as burndown and velocity. Kanban tools focus on continuous flow, WIP limits and flow metrics. Most modern tools support both.
Should all teams use the same Scrum tool?
It helps for coordination and reporting across teams, but forcing one tool on very different teams can backfire. A common compromise is one platform for planning and reporting, with integrations for teams that need specialised tools.
Who should own the Scrum tool?
Anyone can administer it, often a Scrum Master or a tool administrator. What matters is that the team decides how the workflow works and the tool supports that, rather than dictating it.
How do you choose between Scrum tools?
List must-have features, set weighted criteria, trial two or three tools on a real Sprint, score them with the people who used them and check the total cost of the plan you really need.
Do Scrum tools replace Scrum events?
No. Tools support transparency, but the conversations at Sprint Planning, the Daily Scrum, the Sprint Review and the Retrospective cannot be replaced by software.
Which Scrum tool is best for non-software teams?
Teams in marketing, HR or operations usually adopt easier, more visual platforms such as Wrike, monday.com or Asana faster than developer-focused trackers. Choose based on your trial and how much Sprint reporting you need.