Agile guide · Agile foundations
Agile Glossary: 120+ Agile Terms Defined A to Z
This Agile glossary defines more than 120 terms from Agile, Scrum, Kanban, Extreme Programming (XP), Lean and scaled Agile, in plain English and A to Z. Where it matters, each definition says where the term comes from, so you can tell official Scrum Guide language from common practice. Find a term in the letter sections, then use the commonly confused terms and the worked Sprint example to see how the vocabulary fits together.
Key takeaways
- Agile vocabulary comes from several sources: the Agile Manifesto, the 2020 Scrum Guide, Kanban, XP, Lean and scaling frameworks such as SAFe.
- Story points, velocity, epics, user stories and the Definition of Ready are widely used practices, not part of the Scrum Guide.
- Several terms have been renamed: "Development Team" is now Developers, "self-organising" is now self-managing, and since SAFe 6.0 PI means Planning Interval.
- The most commonly confused pairs are burndown and burnup, cycle time and lead time, velocity and throughput, and the Definition of Done and acceptance criteria.
- Agree a short team glossary, especially for "done", "ready" and when the clock starts for cycle time.
What is an Agile glossary?
An Agile glossary is a reference list of the terms used in Agile ways of working, each with a short, plain definition. It covers values and principles, frameworks such as Scrum and Kanban, roles, events, artifacts, estimation, flow metrics, engineering practices and scaling, so that everyone on a team uses the same words in the same way.
Shared vocabulary supports transparency: it breaks down quickly when one person's "done" means coded and another's means released. Official Scrum terms below follow the 2020 Scrum Guide, still the current version. For official Scrum vocabulary only, use our Scrum glossary. See what Agile project management is for the bigger picture.
Agile terms A to B
A
| Term | Definition |
|---|---|
| Acceptance criteria | Conditions one specific backlog item must meet to be accepted. Unlike the Definition of Done, they differ for each item. See user stories. |
| Acceptance test-driven development (ATDD) | Writing acceptance tests with business representatives before building a feature. |
| Agile | A way of working that delivers in short cycles, seeks frequent feedback and adapts plans, guided by the Agile Manifesto. |
| Agile coach | Someone who helps teams and leaders adopt and improve Agile ways of working through coaching, teaching and facilitation. |
| Agile Manifesto | Four values and twelve principles written by seventeen practitioners at Snowbird, Utah, in February 2001. See the Agile Manifesto. |
| Agile mindset | The attitudes behind Agile practice: curiosity, learning from feedback, collaboration and comfort with change. |
| Agile Release Train (ART) | In SAFe, a long-lived team of Agile teams, typically 50 to 125 people, that plans and delivers together. |
| Artifact (Scrum) | The Product Backlog, Sprint Backlog and Increment. Each has a commitment that gives it focus. |
B
| Term | Definition |
|---|---|
| Backlog | An ordered list of work still to be done, usually the Product Backlog. Try our product backlog template. |
| Backlog refinement | Ongoing work to split, clarify, order and size backlog items for future Sprints. Formerly called grooming. See backlog refinement. |
| Behaviour-driven development (BDD) | Describing behaviour through plain-language examples, often Given–When–Then, that become automated tests. |
| Blocker | Anything that stops a work item progressing, such as a missing decision or another team's dependency. |
| Burndown chart | A chart of work remaining against time, sloping down towards zero as work is finished. |
| Burnup chart | A chart of work completed rising over time, with a separate total-scope line so scope changes stay visible. |
Agile terms C
C
| Term | Definition |
|---|---|
| Cadence | A regular, predictable rhythm of events, such as two-week Sprints. |
| Capacity | How much work a team can realistically take on in a period after leave, support and other commitments. |
| Ceremony | Informal name for a recurring Agile meeting; the Scrum Guide says event. See Agile meetings and ceremonies. |
| Class of service | In Kanban, a policy for handling a type of work, such as expedite, fixed date or standard. |
| Commitment (Scrum) | Product Goal for the Product Backlog, Sprint Goal for the Sprint Backlog, Definition of Done for the Increment. |
| Continuous delivery (CD) | Keeping software releasable at all times so any change can go live quickly and safely. |
| Continuous deployment | Automatically releasing every change that passes the pipeline to production. |
| Continuous integration (CI) | Merging code into a shared mainline several times a day, with automated build and tests. |
| Cost of delay | The value lost by delivering something later rather than sooner; used for prioritisation. |
| Cross-functional team | A team with all the skills needed to turn backlog items into finished work without hand-offs. |
| Cumulative flow diagram (CFD) | A stacked area chart of items in each workflow stage over time; widening bands show bottlenecks. See the cumulative flow diagram. |
| Cycle time | Elapsed time from starting work on an item to finishing it. |
Agile terms D to E
D
| Term | Definition |
|---|---|
| Daily Scrum | A 15-minute event in which the Developers inspect progress towards the Sprint Goal and adapt their plan. |
| Daily stand-up | General name for a short daily team check-in; Scrum's version is the Daily Scrum. |
| Definition of Done (DoD) | A formal description of the quality the Increment must meet; anything short of it is not Done. See the Definition of Done. |
| Definition of Ready (DoR) | An optional checklist for when an item is clear enough to enter a Sprint. Not part of the Scrum Guide. |
| Developers (Scrum) | Scrum Team members who create the usable Increment each Sprint. Replaced "Development Team" in 2020. |
| DevOps | Culture and practices joining development and operations to deliver changes quickly and reliably. |
| Disciplined Agile (DA) | A toolkit for choosing and tailoring your way of working, owned by PMI since 2019. |
| DORA metrics | Five software delivery measures since 2024: change lead time, deployment frequency, failed deployment recovery time, change fail rate and deployment rework rate. |
| DSDM | Dynamic Systems Development Method: an Agile framework that fixes time and cost and varies scope. It popularised MoSCoW. |
E
| Term | Definition |
|---|---|
| Empiricism | Deciding based on observation. Scrum's three pillars are transparency, inspection and adaptation. |
| Epic | A body of work too big for one Sprint, split into user stories. See epics vs stories vs tasks. |
| Escaped defect | A defect found after work was considered Done, often by users. |
| Estimation | Forecasting the size or effort of work, usually relatively in Agile teams. |
| Extreme Programming (XP) | Kent Beck's Agile method from the late 1990s, known for pair programming, TDD, continuous integration and refactoring. |
Agile terms F to I
F
| Term | Definition |
|---|---|
| Feature | Functionality that delivers value to users. In SAFe, it sits between epic and story and fits in one Planning Interval. |
| Feature toggle | A switch (feature flag) that turns functionality on or off without redeploying. |
| Fibonacci scale | Story point scale such as 1, 2, 3, 5, 8, 13, 20; widening gaps reflect uncertainty. |
| Flow | The smooth, steady movement of work from start to finish. |
| Flow efficiency | Active work time ÷ total elapsed time × 100. Low values mean items mostly wait. |
G to H
| Term | Definition |
|---|---|
| Given–When–Then | Format for acceptance criteria: given a context, when an action happens, then an outcome follows. |
| Goodhart's law | Usually summarised as "when a measure becomes a target, it ceases to be a good measure". |
| Hardening sprint | A Sprint reserved for testing and fixing before release; usually a sign the Definition of Done is too weak. |
I
| Term | Definition |
|---|---|
| Impediment | Anything slowing the team. The Scrum Master is accountable for causing impediments to be removed. |
| Increment | A usable stepping stone towards the Product Goal that meets the Definition of Done. A Sprint can produce several. |
| Information radiator | A large, visible display of team information, such as a board or chart. |
| INVEST | Bill Wake's checklist for user stories: Independent, Negotiable, Valuable, Estimable, Small, Testable. |
| Iteration | A fixed time-box in which a team builds and reviews working results; a Sprint in Scrum. |
| Iterative and incremental | Improving work through repeated cycles (iterative) and delivering it in usable pieces (incremental). |
Agile terms K to M
K
| Term | Definition |
|---|---|
| Kaizen | Japanese for "change for the better": continuous small improvements, central to Lean. |
| Kanban | A strategy for improving flow by visualising work, limiting WIP and managing flow. David J. Anderson's Kanban Method applies it to evolutionary change. See what is Kanban. |
| Kanban board | A board with a column per workflow stage and a card per item. See Kanban boards. |
L
| Term | Definition |
|---|---|
| Large-Scale Scrum (LeSS) | Framework for two to eight teams on one product with one Product Owner; LeSS Huge covers more. |
| Lead time | Elapsed time from a request being made to its delivery. See cycle time vs lead time. |
| Lean | Thinking from the Toyota Production System focused on customer value, flow and removing waste. |
| Little's Law | In a stable system, average cycle time = average WIP ÷ average throughput. |
M
| Term | Definition |
|---|---|
| Minimum marketable feature (MMF) | The smallest piece of functionality worth releasing to all customers on its own. |
| Minimum viable product (MVP) | The smallest version of a product that tests a key assumption with real users; popularised by Eric Ries's The Lean Startup. |
| Mob programming | The whole team working on one task at one computer; also called ensemble programming. |
| Monte Carlo forecasting | Simulating many futures from past throughput to give probabilistic forecasts, such as "85% likely within 9 weeks". |
| MoSCoW | Prioritisation into Must have, Should have, Could have and Won't have (this time). |
Agile terms N to P
N to O
| Term | Definition |
|---|---|
| Nexus | Scrum.org's framework for three to nine Scrum Teams on one product, with a Nexus Integration Team. |
| Non-functional requirement | A quality such as performance, security or accessibility, often built into the Definition of Done. |
| OKRs | Objectives and key results: a qualitative objective paired with a few measurable results. |
| Outcome | The change in user behaviour or business results that work produces, as opposed to output. |
P
| Term | Definition |
|---|---|
| Pair programming | Two developers working on the same code at one workstation, swapping roles often. An XP practice. |
| Persona | A research-based profile representing a group of users. |
| PI Planning | In SAFe, a cadence-based event, typically two days, in which the whole ART plans the next Planning Interval. See PI Planning. |
| Planning Interval (PI) | In SAFe, a time-box of typically 8 to 12 weeks. Called Program Increment before SAFe 6.0 (2023). |
| Planning poker | Consensus estimation: everyone reveals a card at once, then the highest and lowest explain their reasoning. |
| Product Backlog | The single ordered list of what is needed to improve the product; its commitment is the Product Goal. |
| Product Goal | The long-term objective for the Scrum Team, added in the 2020 Scrum Guide. |
| Product Owner | The one person accountable for maximising product value, including ordering the Product Backlog. See Scrum team roles. |
| Psychological safety | A shared belief that people can raise problems and admit mistakes without fear of punishment. |
| Pull system | New work starts only when there is capacity, rather than being pushed onto the team. |
Agile terms R to S
R
| Term | Definition |
|---|---|
| Refactoring | Improving the internal structure of code without changing its behaviour. |
| Relative estimation | Sizing items by comparing them with each other rather than in hours. |
| Release | Making an Increment available to users, at any point in a Sprint. |
| Release planning | Forecasting which features are likely to be ready for a release and when, as a range. |
| Retrospective | A regular meeting to inspect how the team works and agree improvements. See the Sprint Retrospective. |
| Roadmap | A high-level, regularly updated plan of goals and themes over time. |
S
| Term | Definition |
|---|---|
| Scaled Agile Framework (SAFe) | A framework for applying Lean and Agile practices across many teams and the enterprise. See SAFe. |
| Scrum | A lightweight framework in which a Scrum Team delivers value in Sprints of one month or less. See what is Scrum. |
| Scrum Master | Accountable for establishing Scrum and for the Scrum Team's effectiveness. |
| Scrum of Scrums | A coordination meeting for representatives of several Scrum Teams. |
| Scrum Team | One Scrum Master, one Product Owner and Developers; typically 10 or fewer people. |
| Scrum values | Commitment, focus, openness, respect and courage. |
| Scrumban | A blend of Scrum and Kanban, often Scrum's events with Kanban's WIP limits and flow metrics. |
| Self-managing team | A team that decides who does what, when and how. Replaced "self-organising" in the 2020 Scrum Guide. |
| Service level expectation (SLE) | In Kanban, a forecast such as "85% of items finish within 8 days". |
| Spike | A time-boxed piece of research to reduce uncertainty before building. Originally an XP term. |
| Sprint | A fixed time-box of one month or less in which a Scrum Team turns ideas into value. |
| Sprint Backlog | The Sprint Goal, the selected Product Backlog items and the Developers' plan. |
| Sprint Goal | The single objective for the Sprint, created in Sprint Planning. |
| Sprint Planning | The event that starts a Sprint: why it is valuable, what can be done and how. |
| Sprint Review | The event in which the Scrum Team and stakeholders inspect the Sprint's outcome and adapt the plan. |
| Sprint zero | An informal set-up period before the first Sprint; not a Scrum term. |
| Stakeholder | Anyone with an interest in, or affected by, the product. |
| Story mapping | Arranging stories along a user journey to plan releases; associated with Jeff Patton. |
| Story points | Relative units for sizing backlog items. See story points. |
| Sustainable pace | A rhythm the team can keep up indefinitely; one of the Manifesto principles. |
| Swarming | Several team members working together to finish one item. |
| Swimlane | A horizontal band on a board separating types of work. |
Agile terms T to Z
T
| Term | Definition |
|---|---|
| T-shaped skills | Deep expertise in one area plus working knowledge of others. |
| T-shirt sizing | Rough relative sizing in XS, S, M, L and XL, useful for epics. |
| Task | A technical step needed to complete a user story. |
| Technical debt | The future cost of shortcuts, a metaphor coined by Ward Cunningham. See technical debt in Scrum. |
| Test-driven development (TDD) | Write a failing test, write code to pass it, then refactor. An XP practice. |
| Theme | A broad area of focus that groups several epics. |
| Three Amigos | Business, development and testing perspectives agreeing what a story means before work starts. |
| Three Cs | Ron Jeffries' view of a story: Card, Conversation and Confirmation. |
| Throughput | The number of items finished per period; needs no estimates. |
| Time-box | A fixed maximum duration, such as the 15-minute Daily Scrum. |
| Trunk-based development | Integrating small changes into one main branch at least daily. |
U to V
| Term | Definition |
|---|---|
| User story | A need described from the user's view: "As a [user], I want [goal] so that [benefit]". See our user story template. |
| Value stream | All the steps, including waiting, that deliver value from request to customer. |
| Velocity | Story points finished to the Definition of Done per Sprint, for the team's own forecasting. See the velocity chart. |
| Vertical slice | An item that cuts through every layer to deliver a small piece of working functionality. |
W to Z
| Term | Definition |
|---|---|
| Waterfall | A sequential, plan-driven approach; also called predictive. |
| Weighted shortest job first (WSJF) | In SAFe, cost of delay ÷ job size, so short, valuable items rise to the top. |
| Work in progress (WIP) | Items started but not finished. |
| WIP limit | A cap on items in a stage or the whole system. See WIP limits. |
| Work item age | How long an unfinished item has been in progress; a Kanban Guide flow metric. |
| Working agreement | Rules a team agrees for how it works together. |
Agile terms by category and source
This table regroups the key terms so you can see which are framework rules and which are optional practices.
| Category | Key terms | Source |
|---|---|---|
| Values and principles | Agile, Agile Manifesto, sustainable pace | Agile Manifesto (2001) |
| Scrum accountabilities, events and artifacts | Product Owner, Scrum Master, Developers; Sprint and its four events; Product Backlog, Sprint Backlog, Increment and their commitments | 2020 Scrum Guide |
| Backlog and estimation | User story, epic, acceptance criteria, INVEST, Definition of Ready, story points, velocity, planning poker | Common practice |
| Flow and metrics | WIP, cycle time, lead time, throughput, work item age, SLE, CFD | Kanban and Lean |
| Engineering practices | TDD, pair programming, refactoring, CI, CD, feature toggles | XP and DevOps |
| Scaling | ART, Planning Interval, PI Planning, WSJF, Nexus, LeSS | SAFe, Scrum.org, LeSS |
Equivalent and renamed Agile terms
Different frameworks use different words for similar ideas, and some terms have been renamed.
| You may hear | Current or equivalent term | Notes |
|---|---|---|
| Iteration | Sprint | Iteration is used in XP and SAFe. |
| Ceremony | Event | The Scrum Guide uses event. |
| Daily stand-up | Daily Scrum | Scrum's version, for the Developers, time-boxed to 15 minutes. |
| Backlog grooming | Product Backlog refinement | Renamed in the 2013 Scrum Guide. |
| Development Team | Developers | Changed in the 2020 Scrum Guide. |
| Self-organising | Self-managing | Changed in the 2020 Scrum Guide. |
| Program Increment | Planning Interval | Renamed in SAFe 6.0 (2023); still PI. |
| Flow time, flow velocity, flow load | Cycle time, throughput, WIP | SAFe's names for similar flow measures. |
Read Agile vs Scrum to see how Scrum relates to Agile as a whole.
Commonly confused Agile terms
These pairs cause the most misunderstandings. The numbers are illustrative.
Burndown vs burnup
A release starts at 100 points. After two Sprints, 40 are finished, then 20 points of new scope are added. The burndown jumps from 60 remaining to 80, as if the team went backwards. The burnup shows completed work still at 40 and the scope line stepping up from 100 to 120.
Cycle time vs lead time
A request is logged on 1 March, started on 10 March and delivered on 14 March. Lead time is 13 days; cycle time is 4 days. The customer feels the lead time; the team mostly controls the cycle time.
Velocity vs throughput
A team finishes six items sized 3, 5, 2, 8, 3 and 5 points. Velocity is 26 points; throughput is 6 items. Both can drive forecasts, but throughput needs no estimating.
Done, acceptance criteria and ready
| Term | Applies to | Example | In the Scrum Guide? |
|---|---|---|---|
| Definition of Done | Every item | Code reviewed, tests automated, deployed to staging | Yes |
| Acceptance criteria | One item | A user can cancel up to 24 hours before the appointment | No |
| Definition of Ready | Items before Sprint Planning | Has acceptance criteria and fits in one Sprint | No |
Epic vs user story vs task
The epic "Online appointment booking" contains the story "As a patient, I want to cancel my booking online so that I do not have to phone", which contains tasks such as "Add cancel button" and "Send cancellation email".
Worked example: Agile terms in a two-week Sprint
Follow one illustrative piece of work through a Sprint for a six-person Scrum Team building an appointment booking service.
- Goal. The roadmap shows a self-service theme; the Product Owner sets the Product Goal: patients manage their own appointments online.
- Refinement. The epic is split into user stories that meet INVEST, with acceptance criteria agreed in a Three Amigos conversation.
- Estimation. The Developers use planning poker. One story has too many unknowns, so they add a two-day spike.
- Sprint Planning. Using a recent velocity of about 24 points and reduced capacity, the team agrees the Sprint Goal, "Patients can cancel a booking online", and forms the Sprint Backlog.
- During the Sprint. A WIP limit of four applies on the Kanban board. At the Daily Scrum, one item's work item age is unusually high, so two Developers swarm on it. The Scrum Master helps remove an impediment.
- Done. Stories meet the Definition of Done, including TDD and continuous integration, and form a usable Increment released behind a feature toggle.
- Review and Retrospective. At the Sprint Review, stakeholder feedback adds items to the Product Backlog. At the Retrospective, the team agrees to tackle technical debt in the booking module.
How to create an Agile glossary for your team
- Collect the terms people use, including local jargon and abbreviations from your board and meetings.
- Choose sources of truth, such as the 2020 Scrum Guide and the Kanban Guide, so debates have a reference point.
- Agree high-risk definitions first: what "done" and "ready" mean, and when the clock starts for cycle time.
- Mark local terms so nobody mistakes team conventions for framework rules.
- Publish it beside your working agreement and link it from onboarding notes.
- Review it at a Retrospective every few months, or whenever a misunderstanding causes rework.
Our backlog and story templates use the same terms as this glossary. See the user story template and the product backlog template.
Common mistakes with Agile terminology
- Using retired terms such as "Development Team", "grooming" or "self-organising".
- Treating practices as rules. Story points, velocity and the Definition of Ready are optional.
- Calling any deadline a sprint. A Sprint has a goal, a plan and a usable Increment, not just a rush.
- Comparing velocity between teams. Points are relative to each team; see Agile metrics and KPIs.
- Mixing up done and released. Work can be Done without being released yet.
Frequently asked questions
What are the basic Agile terms every beginner should know?
Start with Agile, Sprint, Product Backlog, user story, Definition of Done, Daily Scrum, retrospective, Kanban board, WIP limit and velocity.
What is the difference between Agile and Scrum?
Agile is a broad approach defined by the Agile Manifesto. Scrum is one specific framework that applies it, with defined accountabilities, events and artifacts.
What is a sprint in Agile?
A fixed time-box of one month or less, often two weeks, in which a Scrum Team works towards a Sprint Goal and produces at least one usable Increment.
What is the difference between an epic, a user story and a task?
An epic is a large body of work, a user story is a slice of it finishable in one Sprint, and a task is a technical step towards a story.
What does WIP mean in Agile?
Work in progress: items started but not finished. WIP limits reduce multitasking and shorten cycle time.
What is velocity in Agile?
The story points a team finishes to the Definition of Done per Sprint. Use it for the team's own forecasts, never to compare teams.
What is a spike in Agile?
A short, time-boxed piece of research or prototyping that answers a question before the team commits to building something.
What is the difference between a burndown and a burnup chart?
A burndown shows work remaining. A burnup shows work completed against a separate scope line, so scope changes are visible.
Are story points part of Scrum?
No. The 2020 Scrum Guide mentions neither story points nor velocity; they are common practices.
What is the Definition of Ready?
An optional checklist for when a backlog item is clear and small enough to enter a Sprint. It is not part of the Scrum Guide.
What does MVP mean in Agile?
Minimum viable product: the smallest version of a product that lets you test a key assumption with real users.
Is "ceremony" an official Scrum term?
No. The Scrum Guide calls the Sprint, Sprint Planning, Daily Scrum, Sprint Review and Sprint Retrospective events.